91Ô­´´

Skip to content

LSS renovations, upgrades underway

Work part of $26.2 million in upgrades
9054294_web1_DM2PQgDU8AEySCi

Work is underway on upgrades at 91Ô­´´ Secondary.

Photos posted to Twitter show students watching and filming as the LSS metalwork shop was torn down on Monday (Oct. 23).

The work is part of at the school, which opened in 1948.



About the Author: 91Ô­´´ Advance Times Staff

Read more



(or

91Ô­´´

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }